The project at Centuria's high-volume warehouse in Bundamba posed an exciting challenge: a massive 13,000 square metre roofing installation tailored for a logistics facility. This immense scale brought unique demands. The team had to ensure precision and performance, focusing on turning a large-scale construction dream into reality. For such grand facilities, accuracy becomes a priority, almost like weaving a detailed fabric without a single snag. The objective was clear: deliver a watertight, compliant roofing system that perfectly aligns with the entire site program.
Collaboration from the outset with Tomkins Commercial played a pivotal role in setting the groundwork. Together, a comprehensive scope was established to cover every detail of the installation process. This partnership meant merging technical expertise with on-ground teamwork to uphold stringent timelines and quality expectations. The effective synergy ensured that every phase, from initial planning to the final rivet, met both architectural vision and practical needs.
Planning and Preparation
Before a single panel touched the roof beams, thorough planning set the stage for success. Here's what the preparation involved:
- Site Inspection: A detailed site evaluation was crucial. Teams conducted assessments to pinpoint potential hurdles and craft tailored strategies.
- Precise Lift Plans: Developing clear lift plans ensured safety and efficiency, critical for coordinating with on-site machinery and personnel.
- Collaboration with Multiple Trades: Overlapping tasks demanded seamless coordination. Clear communication with various trades ensured smooth workflows and minimal disruption.
- Early Flashing Approvals: Speeding up these approvals helped prevent delays. By securing these ahead of time, interruptions were minimised.
- Roof Sequencing Integration: The integration of roof sequencing with builder timelines aimed to align the roofing installation with overall construction milestones.
Unlocking each of these strategic elements took more than just technical know-how. It required a flexible approach, cooperation across disciplines, and a focus on anticipating challenges before they became obstacles. With this level of preparation, confidence grew that the roofing system would meet every expectation.
Technical Execution
With a solid foundation set by planning, the build phase began. Each piece of industrial-grade roofing material was installed with precision. Every metre of the 13,000 square metre expanse had to reflect both design intent and on-site practicality.
There were natural hiccups along the way. Weather shifts, material lead times and sequencing demands kept the team on alert. But each challenge was met with timely solutions. The staged Inspection Test Plan (ITP) allowed quality control to happen in layers rather than just as a final check. This meant that potential issues could be spotted and corrected as the project progressed, not after the fact.
Progress unfolded in stages. Every advancement brought the team closer to creating a secure envelope for the warehouse operations within. These sorts of builds can’t afford shortcuts. The roof had to stand up to daily demands and unexpected extremes, without compromise.
Weather Considerations
Queensland’s climate doesn’t make roofing work easy. The Centuria warehouse roofing project had to account for both sweltering heat and torrential downpours. Conditions can shift overnight from hot and dry to stormy and wet, so there’s no room for guesswork.
Material choice was therefore critical. Everything used on the roof had to handle prolonged exposure to UV as well as sudden soakings of rain. Rust-resistance, durability, and proven regional performance were non-negotiable. Only Queensland-tested systems made the cut.
To manage potential water build-up, a robust drainage plan was designed. This included the integration of systems that aligned tightly with the existing building structure. Their function was to reduce pressure on the roof and surrounding areas by directing water away cleanly and quickly.
Key weather solutions included:
- Material Selection: Specified to endure Queensland’s high sun exposure and rainfall rates.
- Drainage Systems: Engineered layouts moved water efficiently, preventing pooling or internal pressure points.
- Structural Integration: Every detail accounted for connection points that matched existing roof lines and framing, avoiding weak spots or inefficiencies.
By tackling climate concerns up front, the team avoided reactive work down the line. The result is a weather-resilient, structurally sound roof that will hold up season after season.
Project Outcome
Reaching the final phase meant clocking off every item on the compliance list. Queensland building codes are strict for a reason. Safety must match function. Before handover, the roof went through a detailed final inspection, ensuring it met all required standards.
The project hit its targets. Installation was completed on schedule, supporting other works across the site without delay. Zero tolerance for compromise meant quality did not take a back seat to pace. In fact, the final result struck the balance that every industrial site hopes for: a reliable, performance-driven asset delivered on time.
The roof now stands as a testament to detailed planning, expert execution, and commitment to keeping things moving efficiently. For Centuria’s logistics operations, this means a dry, protected space running at full capacity from day one.
Feedback from stakeholders was overwhelmingly positive. Key concerns around coordination, build speed and compliance were met or exceeded. Minimal disruption to the site's other works areas gave the entire development team confidence, from the builder through to the facility managers.
Your Project Can Run This Smoothly Too
If you're responsible for getting your facility operational on a tight timeline, you understand how many variables there are to manage. Roofing often sits close to the critical path. It has to come together seamlessly, or the flow-on effects can be big.
This case shows what’s possible when roofing is handled proactively. From early coordination with your builder and other trades, right through to tight quality checks and weather planning, a structured approach works best.
Whether your site is facing heat extremes, high rainfall, or constant workflow overlaps, there’s always a practical solution. It starts with knowing your goals and working with teams that speak construction fluently. Combining industrial expertise with Queensland building requirements leads to long-term confidence in the final product.
Your facility deserves a roof that doesn’t just keep weather out, but helps the whole site run better. When it’s done right, that reliability pays off every day. Getting professional installation with technical oversight gives you one less thing to worry about and one more step toward deadlines met.
If your upcoming project requires the same level of precision and planning as the Centuria warehouse roofing, Haggarty Roofing Pty Ltd is ready to support you with professional installation and Queensland-tested systems. Learn how our industrial-grade solutions can help protect your facility by exploring our approach to Centuria warehouse roofing.